For all the facility owners and managers here....
If you could go back and do something different in the construction, design or layout of your facility, what would it be?
Steve
-
18th August 2011, 10:50 AM #2
Moderator
- Join Date
- Dec 2007
- Location
- Central Virginia - Airplanes - Hotels
- Posts
- 1,253
Re: What would you do different?
Steve
One of the biggest development mistakes that I still see being made is not laying out the entrance to allow access to the office without having to go through the security gate. It becomes such a barrier for not only new potential customers, but for existing customers who are stopping by to make a payment.
MisterJim444Learning Never Ends, But Will Time?
-
18th August 2011, 11:02 AM #3
Re: What would you do different?
drive through loading bays
-
18th August 2011, 11:45 AM #4
Re: What would you do different?
Oh yah and a big penthouse on the roof overlooking the lake ... some may think I'm kidding. And the helipad got chopped out due to the reccession ... once again I'm not joking. All I can say is some business partners have the most interesting requests.
-
18th August 2011, 12:46 PM #5
Member
- Join Date
- Jan 2011
- Posts
- 71
Re: What would you do different?
At my particular site I would change many things.
-We have freight only elevators, I would have passenger/freight combined.
-We have regular doors on the inside units, I would have wider roll up doors.
-Two buildings are drywall/wood inside, I would have them corrugated metal NO PAINTING!!!
-I would change the unit sizes of several downstairs larger units to many little ones.
-I would never have built the buildings the way they are designed ie: rounded corners, metal sheathed back half of building.
-The manager apartment would have a seperate entrance (not through the office) and a balcony/deck bigger than 8' x 4' that doesnt face the parking for the office.
-I would have designed the entrance with the fact in mind HUGE moving trucks may need easy access.
I think that's enough!
Shane
-
18th August 2011, 03:08 PM #6
Re: What would you do different?
Construction: Hire a contractor that knows what they are doing. Just because they assembled several metal buildings or attended the manufactures certification class does not mean their crew knows how to do it properly. Make sure the engineer is working specifically for you and not the contractor.
Design: Hire someone that has actually worked at several storage facilities as onsite manager/operator and has a background in construction and/or design. They need to be able to read and understand prints....... Their experience will provide a unique knowledge about how the overall flow of customer and manager interaction will take place throughout the facility, and all the different problem areas.
Layout: Duel gates, one for entry & one for exit. Entry driveway long enough to accommodate any vehicle and trailer entering the facility without blocking passing traffic.
-
18th August 2011, 04:59 PM #7
Senior Member
- Join Date
- May 2008
- Location
- Work in Lady Lake Florida
- Posts
- 428
Re: What would you do different?
Put the office inside of the building instead of a long parking lot away!
Tall Terri
Murphy was an Optomist!
-
19th August 2011, 02:11 PM #8
Member
- Join Date
- Apr 2011
- Posts
- 72
Re: What would you do different?
I would take better care of my teeth!
-
21st August 2011, 03:22 PM #9
-
21st August 2011, 08:29 PM #10
Senior Member
- Join Date
- May 2008
- Location
- Work in Lady Lake Florida
- Posts
- 428
Re: What would you do different?
Tall Terri
Murphy was an Optomist!


LinkBack URL
About LinkBacks
Reply With Quote


Hi I like all your ideas. I even like them...
Marketing Ideas ??